Cookstown: +44 (0)28 8676 2533, Falkirk: +44 (0)1506 888298

Health

ACU & Quiet Room at Craigavon Area Hospital

Construction of the New Ambulatory Care Unit (ACU) and a new Quiet Room in the existing Courtyard area of the Main Hospital Complex.  The ACU is a new service, which offers same day care to patients at the hospital

The construction works for the Southern Health & Social Care Trust were to be completed as soon as possible, ahead of schedule, as part of the Trust’s plan to manage the Covid-19 ‘surge’ capacity at the hospital

Office & Coffee Dock at Omagh Hospital

The strip out, preparation and associated building works to deliver a new office, coffee dock, café pay point, kitchen store and waiting area including demolitions and alterations, floor, wall and ceiling finishes, mechanical and electrical installations with fixtures, fittings and equipment

Replacement MRI Suite at Musgrave Park Hospital

Refurbishment to provide a new MRI suite and extensive refurbishment of ancillary areas at Musgrave Park Hospital including the full strip out of existing services and finishes, demolitions, structural and internal layout alterations, sub-structure works, finishes and decorations, external works and drainage, and mechanical and electrical building services installations to the areas.

St Ita's Hospital, Dublin

The restoration and conversion of the ground floor area to provide new facilities at Units 1, 2 & 3 at St. Ita’s Hospital.  External works included demolition and the construction of additional car parking 

Clonskeagh Hospital Campus Vergemount Hall, Dublin

Upgrade and refurbishment works with full fit out within the existing Vergemount Hall at Clonskeagh Hospital Campus including the formation of a new entrance vestibule 

Altnagelvin Hospital Ward 3, Derry

Refurbishment works at Ward 3, Tower Block, Altnagelvin Hospital carried out within a live hospital environment with wards above and below in operation. 

Lagan Valley Hospital, Lisburn

Replacement roof covering including insulation and refurbishment to the outpatients department at Lagan Valley Hospital carried out within a live operational hospital. 

Downshire Hospital, Downpatrick

Extension and refurbishment to existing building

Ulster Hospital, Belfast

Extensive internal and external refurbishments to form new quality innovation centre

Modley House, Ellon, Aberdeenshire

Phased refurbishment of existing 48 bedroom care home including refurbishment of self-contained flats, toilets, bathrooms, corridors and lift replacement. Construction of new sprinkler house building for new sprinkler system within building.

Cedar Villa, Gransha

Extension to include visiting facility, new lift and reception area. Refurbishment of existing corridors, wards, toilets and offices.

Gilbertbain Hospital, Shetland

Re-roofing of existing hospital building and installation of new edge protection systems.

Holywell Hospital, Antrim

Refurbishment of existing wards, toilets and corridor upgrades.

Mountfield Hosptial, Shetland

Phased refurbishment of wards, offices and toilets.

Bangor Health Centre

Extension, re-roofing and phased refurbishments

Daisy Hill Hospital, Newry

Phased internal refurbishments to include treatment rooms, reception areas and toilets

Altnagelvin Hospital, Derry

A&E wing phased refurbishment to include wards, corridors, toilets and stores

St Jame’s Hospital, Dublin

Phased refurbishment of wards, offices and toilets

Cedar House, Antirm Hospital

Refurbishment of staff nursing facilities to include bedroom, bathroom and kitchen refurbishment.